Close
Unlocking solutions since 1940
Menu
Master Locksmiths

Templates for Blocking out

Please select and click to view the appropriate diagram for products that are installed on your project.

Once you have viewed understood the blocking out requirements please complete the form to acknowledge that you have, and that it becomes you and your teams responsibility to ensure that the blocking out is completed correctly by your building teams.
icon
750 x 750 Grab Rail
Shower

Minimum Blocking for 750mm Grab Rail

You must view this file
icon
750 x 750 Grab Rail
Toilet

Minumum Blocking for 750mm Grab Rail

You must view this file
icon
Shower Seat
In Shower

Minimum blocking for Shower Seat

You must view this file
James Bull Logo Alt

Verification of sighting blocking requirements and diagrams

Please ensure each Site Manager/Supervisor and Project Manager complete their part of the form. Failure to acknowledge this may result in liability for any remediation work to retrofit blocking at a later time.

 

 

Project

Personell 1

The documents must be viewed and signed via this form by the Site Manager/Foreman, and Project Manager
Name of First person(Required)
Verification of sighting documents(Required)

Personell 2

The documents must be viewed and signed via this form by the Site Manager/Foreman, and Project Manager
Name of Second person(Required)
Verification of sighting documents(Required)

 

Need more information or clarification?

Please contact Sonny Manuel, our Installer Supervisor at James Bull, on 023 232 2323, or email using the link button